{"id":14490,"date":"2021-10-11T08:01:00","date_gmt":"2021-10-11T00:01:00","guid":{"rendered":"https:\/\/www.rakansarawak.com\/v3\/?p=14490"},"modified":"2021-10-07T14:58:34","modified_gmt":"2021-10-07T06:58:34","slug":"development-projects-in-sarikei-division","status":"publish","type":"post","link":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/","title":{"rendered":"Development Projects in Sarikei Division"},"content":{"rendered":"\n<p class=\"has-drop-cap\"><strong>RAKAN Sarawak<\/strong> reached out to JKR, Sarikei to know on the recent updates on development projects in the Sarikei Division.<\/p>\n\n\n\n<p>The implementation of the development projects is set to provide socioeconomic opportunities to the local communities in various sector such as agriculture and agro-based industry.<\/p>\n\n\n\n<p>Aside from contributing to economic progress, the provision and upgrades of infrastructures and facilities will help to provide a better standard of living of the people by having access to more road network, public healthcare and education.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"550\" height=\"268\" src=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-3-038-2021.jpg\" alt=\"\" class=\"wp-image-14486\" srcset=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-3-038-2021.jpg 550w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-3-038-2021-300x146.jpg 300w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-3-038-2021-150x73.jpg 150w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-3-038-2021-533x261.jpg 533w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><figcaption>The Chief Minister of Sarawak was present at the project launching and earth breaking ceremony for Sarikei Integrated Administrative Centre (IAC) on 23rd June 2020\n(Image source: JKR Sarikei website)<\/figcaption><\/figure><\/div>\n\n\n\n<p>Below are some of the completed and ongoing projects by JKR Sarikei;<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><strong>No<\/strong><\/td><td><strong>Project title<\/strong><strong><\/strong><\/td><td><strong>Contract sum (RM)<\/strong><strong><\/strong><\/td><td><strong>Date Scheduled Completion <\/strong><strong><\/strong><\/td><td><strong>Contract period (Months)<\/strong><strong><\/strong><\/td><td><strong>Funding <\/strong><strong><\/strong><\/td><\/tr><tr><td><strong>1<\/strong><\/td><td>Conservation and upgrading work of Historic Forts in Sarawak Under the 11th RMK Brooke &#8211; Fort, Julau, Sarikei, Sarawak<\/td><td>3,792,019.00<\/td><td>23\/4\/2020 &nbsp;<\/td><td>15<\/td><td>State<\/td><\/tr><tr><td><strong>2<\/strong><\/td><td>Reconstruction and upgrading of dilapidated schools in 2019 \u2013 Package 5: SK Ulu Entaih, Julau, SK Ulu Entabai, Julau, SK Bandar Bintangor, Bintangor<\/td><td>7,118,115.00 &nbsp;<\/td><td>3\/2\/2020 &nbsp;<\/td><td>5<\/td><td>Federal<\/td><\/tr><tr><td><strong>3<\/strong><\/td><td>Proposed redevelopment of dilapidated schools In Sarawak Using Allocation of RM1 Billion (Phase 1) at SK Abang Amin, Meradong, Sarikei<\/td><td>5,197,988.00 &nbsp;<\/td><td>12\/8\/2021 &nbsp;<\/td><td>18<\/td><td>Federal<\/td><\/tr><tr><td><strong>4<\/strong><\/td><td>Proposed Construction of Fire and Rescue Station with Quarters, Bintangor, Sarikei, Sarawak<\/td><td>7,969,720.00 &nbsp;<\/td><td>25\/10\/2019 &nbsp;<\/td><td>18<\/td><td>Federal<\/td><\/tr><tr><td><strong>5<\/strong><\/td><td>Proposed Jalan Pakan\/Ulu Julau\/Ulu Kota, Pakan, Sarikei Division (Phase 2)<\/td><td>129,849,540.91 &nbsp;<\/td><td>22\/05\/2019 &nbsp;<\/td><td>36<\/td><td>State<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"550\" height=\"366\" src=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-1-038-2021.jpg\" alt=\"\" class=\"wp-image-14484\" srcset=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-1-038-2021.jpg 550w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-1-038-2021-300x200.jpg 300w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-1-038-2021-150x100.jpg 150w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><figcaption>Implemented under the 11th Malaysian Plan, the conservation and upgrading work of Fort Brooke at Julau, Sarikei was completed on 31st August 2020\n(Image source: JKR Sarikei website)<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"550\" height=\"366\" src=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-2-038-2021.jpg\" alt=\"\" class=\"wp-image-14485\" srcset=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-2-038-2021.jpg 550w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-2-038-2021-300x200.jpg 300w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-2-038-2021-150x100.jpg 150w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><figcaption>Fort Brooke was built in Nanga Meluan, Julau by Rajah Charles Vyner Brooke in 1935 to protect them from the rebellions in the local community due to tax issues\n(Image source: JKR Sarikei website)<\/figcaption><\/figure><\/div>\n\n\n\n<p><em>(Source: JKR Sarikei) <\/em><em><\/em><\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><strong>No<\/strong><\/td><td><strong>Project title<\/strong><\/td><td><strong>Contract sum (RM)<\/strong><\/td><td><strong>Date Scheduled Completion<\/strong><\/td><td><strong>Contract period (Months)<\/strong><\/td><td><strong>Funding<\/strong><\/td><\/tr><tr><td>1<\/td><td>Retender: Proposed development of dilapidated schools in Sarawak using the RM1 billion allocation (Phase 1) at SK Adin, Sarikei<\/td><td>2,915,945.00 &nbsp;<\/td><td>10\/9\/2021 &nbsp;<\/td><td>12<\/td><td>Federal<\/td><\/tr><tr><td>2<\/td><td>Proposed redevelopment of dilapidated schools in Sarawak using the RM1 billion allocation (Phase 1) at SK Nanga Meluan, Julau<\/td><td>23,880,100.00 &nbsp;<\/td><td>26\/1\/2023 &nbsp;<\/td><td>24<\/td><td>Federal<\/td><\/tr><tr><td>3<\/td><td>Proposed completion of leftover work for dilapidated schools using the Industrialized Building System Method (IBS) for Sarawak State Phase 1 -2018 \u2013 Package 3<\/td><td>5,978,828.00 &nbsp;<\/td><td>20\/10\/2021 &nbsp;<\/td><td>4<\/td><td>Federal<\/td><\/tr><tr><td>4<\/td><td>Retender: Proposed completion of leftover work for Health Clinic (Type 6) at Di Nanga Kemalih, Ulu Entabai, Julau, Sarikei Division, Sarawak<\/td><td>4,719,143.00 &nbsp;<\/td><td>1\/3\/2021 &nbsp;<\/td><td>15<\/td><td>Federal<\/td><\/tr><tr><td>5<\/td><td>Retender: Construction and Completion of Kompleks JPJ Cawangan Sarikei. Sarawak<\/td><td>15,388,130.00 &nbsp;<\/td><td>27\/07\/22 &nbsp;<\/td><td>18<\/td><td>Federal<\/td><\/tr><tr><td>6<\/td><td>Design &amp; Build &amp; Negotiated Contract<br>Proposed Implementation of Jalan Pakan\/Ulu Kota, Pakan, Sarikei Division (Phase 3) &amp; Replacement of Seven (7) temporary Bridges under Phase 1 to Permanent RC Bridges<\/td><td>127,903,207.40 &nbsp;<\/td><td>10\/11\/2024 &nbsp;<\/td><td>42<\/td><td>State<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><em>(Source: JKR Sarikei) <\/em><em><\/em><\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-6-038-2021-1024x567.jpg\" alt=\"\" class=\"wp-image-14489\" width=\"556\" height=\"308\" srcset=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-6-038-2021-1024x567.jpg 1024w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-6-038-2021-600x332.jpg 600w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-6-038-2021-300x166.jpg 300w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-6-038-2021-768x425.jpg 768w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-6-038-2021-150x83.jpg 150w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-6-038-2021-696x385.jpg 696w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-6-038-2021-1068x591.jpg 1068w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-6-038-2021-759x420.jpg 759w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-6-038-2021.jpg 1080w\" sizes=\"auto, (max-width: 556px) 100vw, 556px\" \/><figcaption>Upon completion, the project for proposed completion of leftover work for Health Clinic will replace the old clinic which toprovide a higher operational level capacity and consequently deliver more modern and comfortable health services for the community in Ulu Entabai\n(Image source: JKR Sarikei website)<\/figcaption><\/figure><\/div>\n\n\n\n<p>JKR Sarikei is also involved in implementing Projek Rakyat to ensure the developments will elevate the living standards of the people in Sarikei.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"550\" height=\"341\" src=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-5-038-2021.jpg\" alt=\"\" class=\"wp-image-14488\" srcset=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-5-038-2021.jpg 550w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-5-038-2021-300x186.jpg 300w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-5-038-2021-150x93.jpg 150w, https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-5-038-2021-356x220.jpg 356w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><figcaption>The project of Jalan Pakan\/Ulu Julau\/Ulu Kota Pakan (Phase 2) saw the construction of 15.4 km R3 Standard road which was completed and opened for public usage on 3rd December 2019\n(Image source: JKR Sarikei website)<\/figcaption><\/figure><\/div>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><strong>No<\/strong><\/td><td><strong>Project title<\/strong><strong><\/strong><\/td><td><strong>Construction start date&nbsp; <\/strong><strong><\/strong><\/td><td><strong>Construction completion date <\/strong><strong><\/strong><\/td><td><strong>Duration months<\/strong><strong><\/strong><\/td><td><strong>Phase <\/strong><strong><\/strong><\/td><\/tr><tr><td><strong>1<\/strong><\/td><td>Proposed Upgrading Jalan Pakan, Pakan District, Sarikei Division, Sarawak<br>(11MP &#8211; MTR)<\/td><td>25\/03\/2019 &nbsp;<\/td><td>24\/11\/2020<br>(14\/04\/2022)<br>Revised &nbsp;<\/td><td>20<\/td><td>Under construction<\/td><\/tr><tr><td><strong>2<\/strong><\/td><td>Construction of road connecting Mupong to Sibu \u2013 Tg. Manis road<br>(11MP)<\/td><td>25\/03\/2019 &nbsp;<\/td><td>24\/03\/2021<br>(15\/07\/2021)<br>Revised &nbsp;<\/td><td>24<\/td><td>Under construction<\/td><\/tr><tr><td><strong>3<\/strong><\/td><td>The Construction and Completion of The Proposed Jalan Rh. Sang, Kemalih\/ Rh. Kedit, Sg. Buloh to Rh. Jali, Ulu Entaih (Ng. Segera), (Phase 1), Pakan, Pakan District, Sarikei Division<br>(11MP)<\/td><td>05\/04\/2019 &nbsp;<\/td><td>04\/12\/2020<br>(18\/12\/2021)<br>Revised &nbsp;<\/td><td>20<\/td><td>Under construction<\/td><\/tr><tr><td><strong>4<\/strong><\/td><td>Proposed Jalan Rh. Wilfred Uli \/ Rh. Panggai, Ulu Dayat, Pakan, Sarikei<br>(11MP)<\/td><td>28\/02\/2019 &nbsp;<\/td><td>27\/02\/2021<br>(23\/06\/2021)<br>Revised &nbsp;<\/td><td>24<\/td><td>Under construction<\/td><\/tr><tr><td><strong>5<\/strong><\/td><td>Proposed upgrading of Jalan Bawang Assan\/Tanjung Manis\/Sg Illas\/Kpg Sebena (Fasa II) Meradong District, Sarikei Division<br>(11MP (1B))<\/td><td>13\/03\/2020 &nbsp;<\/td><td>12\/09\/2022<br>(05\/12\/2022)<br>Revised &nbsp;<\/td><td>30<\/td><td>Under construction<\/td><\/tr><tr><td><strong>6<\/strong><\/td><td>Upgrading of Jalan Nyelong By-pass to a dual carriage way, Sarikei<\/td><td>Until approval granted<\/td><td>Until approval granted &nbsp;<\/td><td>12<\/td><td>Pre-contract<\/td><\/tr><tr><td><strong>7<\/strong><\/td><td>Road project from Sibu\/Tanjung Manis intersection to Mupong &#8211; 1km<\/td><td>20\/10\/2021 &nbsp;<\/td><td>19\/06\/2022 &nbsp;<\/td><td>8<\/td><td>Pre-contract<\/td><\/tr><tr><td><strong>8<\/strong><\/td><td>Gravelling The Existing Earth Road from SK Ulu Entaih to Rh Letong, Pakan, Sarikei Division<\/td><td>14\/04\/2022 &nbsp;<\/td><td>13\/4\/2023 &nbsp;<\/td><td>12<\/td><td>Pre-contract<\/td><\/tr><tr><td><strong>9<\/strong><\/td><td>Proposed Jalan Ng. Entaih \/ Rh. Sang Ak Lasa, Kemalih abd Thirteen Spur Roads, Pakan District (Kerja Awalan)<\/td><td>N\/A &nbsp;<\/td><td>N\/A &nbsp;<\/td><td>N\/A<\/td><td>Pre-contract<\/td><\/tr><tr><td><strong>10<\/strong><\/td><td>Construction of Jalan Pasi ke Tanjung Manis including construction of Batang Rajang bridge (Under Coastal Road)<\/td><td>22\/03\/2019 &nbsp;<\/td><td>21\/03\/2023<br>20\/07\/2023<br>(Revised) &nbsp;<\/td><td>48<\/td><td>Under construction<\/td><\/tr><tr><td><strong>11<\/strong><\/td><td>Steel Bridge Sungai Kanowit, Kubu Brooke, Nanga Meluan, Julau, Sarikei<br>(11MP (1B))<\/td><td>06\/12\/2019 &nbsp;<\/td><td>05\/06\/2021<br>(31\/10\/2021)<br>Revised &nbsp;<\/td><td>18<\/td><td>Under construction<\/td><\/tr><tr><td><strong>12<\/strong><\/td><td>Construction of Jambatan Nanga Lasi, Julau<\/td><td>15\/11\/2021 &nbsp;<\/td><td>14\/11\/2022 &nbsp;<\/td><td>12<\/td><td>Pre-contract<\/td><\/tr><tr><td><strong>13<\/strong><\/td><td>Integrated Administrative Centre (IAC) Sarikei (11MP) &nbsp;<\/td><td>17\/07\/2020 &nbsp;<\/td><td>16\/01\/2023<br>(28\/01\/2023)<br>Revised<\/td><td>30<\/td><td>Under construction<\/td><\/tr><tr><td><strong>14<\/strong><\/td><td>Retender:&nbsp; Construction and Completion of The Proposed Surau at Taman Bintang, Bintangor, Sarikei Division (11MP)<\/td><td>07\/04\/2019 &nbsp;<\/td><td>6\/2\/2020 &nbsp;<\/td><td>10<\/td><td>Completed<\/td><\/tr><tr><td><strong>15<\/strong><\/td><td>Proposed Construction and Completion of Maradong Swimming Pool<\/td><td>15\/04\/2022 &nbsp;<\/td><td>14\/4\/2023 &nbsp;<\/td><td>12<\/td><td>Pre-contract<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><em>(Source: JKR Sarikei) <\/em><em><\/em><\/p>\n\n\n\n<p><strong><em>*Jalan \u2013 Road<\/em><\/strong><\/p>\n\n\n\n<p><strong><em>*Jambatan \u2013 Bridge<\/em><\/strong><\/p>\n\n\n\n<p><strong><em>*Surau \u2013 Mosque<\/em><\/strong><\/p>\n\n\n\n<p><strong><em>*Kubu -Fort<\/em><\/strong><\/p>\n<div style='text-align:center' class='yasr-auto-insert-visitor'><!--Yasr Visitor Votes Shortcode--><div id='yasr_visitor_votes_c96ad6942b76b' class='yasr-visitor-votes'><div class=\"yasr-custom-text-vv-before yasr-custom-text-vv-before-14490\">Click to rate this post!<\/div><div id='yasr-vv-second-row-container-c96ad6942b76b'\r\n                                        class='yasr-vv-second-row-container'><div id='yasr-visitor-votes-rater-c96ad6942b76b'\r\n                                      class='yasr-rater-stars-vv'\r\n                                      data-rater-postid='14490'\r\n                                      data-rating='0'\r\n                                      data-rater-starsize='16'\r\n                                      data-rater-readonly='true'\r\n                                      data-rater-nonce='a2c3bbe876'\r\n                                      data-issingular='false'\r\n                                    ><\/div><div class=\"yasr-vv-stats-text-container\" id=\"yasr-vv-stats-text-container-c96ad6942b76b\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"20\" height=\"20\"\r\n                                   class=\"yasr-dashicons-visitor-stats\"\r\n                                   data-postid=\"14490\"\r\n                                   id=\"yasr-stats-dashicon-c96ad6942b76b\">\r\n                                   <path d=\"M18 18v-16h-4v16h4zM12 18v-11h-4v11h4zM6 18v-8h-4v8h4z\"><\/path>\r\n                               <\/svg><span id=\"yasr-vv-text-container-c96ad6942b76b\" class=\"yasr-vv-text-container\">[Total: <span id=\"yasr-vv-votes-number-container-c96ad6942b76b\">0<\/span>  Average: <span id=\"yasr-vv-average-container-c96ad6942b76b\">0<\/span>]<\/span><\/div><div id='yasr-vv-loader-c96ad6942b76b' class='yasr-vv-container-loader'><\/div><\/div><div id='yasr-vv-bottom-container-c96ad6942b76b' class='yasr-vv-bottom-container'><div class='yasr-small-block-bold'><span class='yasr-visitor-votes-must-sign-in'>You must sign in to vote<\/span><\/div><\/div><\/div><!--End Yasr Visitor Votes Shortcode--><\/div>","protected":false},"excerpt":{"rendered":"<p>In order to meet the future demand and rapid development in the Sarikei Division, various development projects are being implemented in the Sarikei Division by the Public Works Department or Jabatan Kerja Raya (JKR), Sarikei. <\/p>\n","protected":false},"author":960,"featured_media":14487,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"yasr_overall_rating":0,"yasr_post_is_review":"","yasr_auto_insert_disabled":"","yasr_review_type":"","footnotes":""},"categories":[23,2,36,37],"tags":[580,758,2056],"class_list":{"0":"post-14490","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-from-rakan-sarawak","8":"category-featured","9":"category-general-info","10":"category-development-updates","11":"tag-education","12":"tag-healthcare","13":"tag-sarikei"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Development Projects in Sarikei Division - RAKAN Sarawak<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Development Projects in Sarikei Division - RAKAN Sarawak\" \/>\n<meta property=\"og:description\" content=\"In order to meet the future demand and rapid development in the Sarikei Division, various development projects are being implemented in the Sarikei Division by the Public Works Department or Jabatan Kerja Raya (JKR), Sarikei.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/\" \/>\n<meta property=\"og:site_name\" content=\"RAKAN Sarawak\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/rakanswk\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-11T00:01:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-4-038-2021.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"550\" \/>\n\t<meta property=\"og:image:height\" content=\"412\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"rakan09sarawak\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@RAKANSarawak\" \/>\n<meta name=\"twitter:site\" content=\"@RAKANSarawak\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"rakan09sarawak\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/\"},\"author\":{\"name\":\"rakan09sarawak\",\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/#\/schema\/person\/f9568270f31f7a204818ac5f97acd774\"},\"headline\":\"Development Projects in Sarikei Division\",\"datePublished\":\"2021-10-11T00:01:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/\"},\"wordCount\":849,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-4-038-2021.jpg\",\"keywords\":[\"Education\",\"Healthcare\",\"Sarikei\"],\"articleSection\":[\"Dari RAKAN Sarawak\",\"Featured\",\"Paparan Semasa | News Feature\",\"Pembangunan Semasa | Development Updates\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/\",\"url\":\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/\",\"name\":\"Development Projects in Sarikei Division - RAKAN Sarawak\",\"isPartOf\":{\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-4-038-2021.jpg\",\"datePublished\":\"2021-10-11T00:01:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#primaryimage\",\"url\":\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-4-038-2021.jpg\",\"contentUrl\":\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-4-038-2021.jpg\",\"width\":550,\"height\":412,\"caption\":\"The Sarikei Integrated Administrative Centre (IAC) project worth RM147.25 million will be the first building with the Green Building & Smart Building concept (Image source: JKR Sarikei website)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.rakansarawak.com\/v3\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Development Projects in Sarikei Division\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/#website\",\"url\":\"https:\/\/www.rakansarawak.com\/v3\/\",\"name\":\"RAKAN Sarawak\",\"description\":\"An eyewitness to Sarawak\u2019s transformation\",\"publisher\":{\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/#organization\"},\"alternateName\":\"Rangkaian Khidmat Awam Negeri Sarawak\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.rakansarawak.com\/v3\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/#organization\",\"name\":\"RAKAN Sarawak\",\"alternateName\":\"Rangkaian Khidmat Awam Negeri Sarawak\",\"url\":\"https:\/\/www.rakansarawak.com\/v3\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2023\/12\/logo-rstagline.png\",\"contentUrl\":\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2023\/12\/logo-rstagline.png\",\"width\":172,\"height\":120,\"caption\":\"RAKAN Sarawak\"},\"image\":{\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/rakanswk\",\"https:\/\/x.com\/RAKANSarawak\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/#\/schema\/person\/f9568270f31f7a204818ac5f97acd774\",\"name\":\"rakan09sarawak\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rakansarawak.com\/v3\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/88c31a4db549f3e8804532b83b490f5ed8f3546ab7a88a35247213bca352891e?s=96&r=g&d=https:\/\/www.rakansarawak.com\/v3\/wp-content\/plugins\/userswp\/assets\/images\/no_profile.png\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/88c31a4db549f3e8804532b83b490f5ed8f3546ab7a88a35247213bca352891e?s=96&r=g&d=https:\/\/www.rakansarawak.com\/v3\/wp-content\/plugins\/userswp\/assets\/images\/no_profile.png\",\"caption\":\"rakan09sarawak\"},\"url\":\"https:\/\/www.rakansarawak.com\/v3\/myprofile\/rakan09sarawak\/\"},false]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Development Projects in Sarikei Division - RAKAN Sarawak","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/","og_locale":"en_US","og_type":"article","og_title":"Development Projects in Sarikei Division - RAKAN Sarawak","og_description":"In order to meet the future demand and rapid development in the Sarikei Division, various development projects are being implemented in the Sarikei Division by the Public Works Department or Jabatan Kerja Raya (JKR), Sarikei.","og_url":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/","og_site_name":"RAKAN Sarawak","article_publisher":"https:\/\/www.facebook.com\/rakanswk","article_published_time":"2021-10-11T00:01:00+00:00","og_image":[{"width":550,"height":412,"url":"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-4-038-2021.jpg","type":"image\/jpeg"}],"author":"rakan09sarawak","twitter_card":"summary_large_image","twitter_creator":"@RAKANSarawak","twitter_site":"@RAKANSarawak","twitter_misc":{"Written by":"rakan09sarawak","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#article","isPartOf":{"@id":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/"},"author":{"name":"rakan09sarawak","@id":"https:\/\/www.rakansarawak.com\/v3\/#\/schema\/person\/f9568270f31f7a204818ac5f97acd774"},"headline":"Development Projects in Sarikei Division","datePublished":"2021-10-11T00:01:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/"},"wordCount":849,"commentCount":0,"publisher":{"@id":"https:\/\/www.rakansarawak.com\/v3\/#organization"},"image":{"@id":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-4-038-2021.jpg","keywords":["Education","Healthcare","Sarikei"],"articleSection":["Dari RAKAN Sarawak","Featured","Paparan Semasa | News Feature","Pembangunan Semasa | Development Updates"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/","url":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/","name":"Development Projects in Sarikei Division - RAKAN Sarawak","isPartOf":{"@id":"https:\/\/www.rakansarawak.com\/v3\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#primaryimage"},"image":{"@id":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-4-038-2021.jpg","datePublished":"2021-10-11T00:01:00+00:00","breadcrumb":{"@id":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#primaryimage","url":"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-4-038-2021.jpg","contentUrl":"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2021\/10\/RO-9-4-038-2021.jpg","width":550,"height":412,"caption":"The Sarikei Integrated Administrative Centre (IAC) project worth RM147.25 million will be the first building with the Green Building & Smart Building concept (Image source: JKR Sarikei website)"},{"@type":"BreadcrumbList","@id":"https:\/\/www.rakansarawak.com\/v3\/2021\/10\/11\/development-projects-in-sarikei-division\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.rakansarawak.com\/v3\/"},{"@type":"ListItem","position":2,"name":"Development Projects in Sarikei Division"}]},{"@type":"WebSite","@id":"https:\/\/www.rakansarawak.com\/v3\/#website","url":"https:\/\/www.rakansarawak.com\/v3\/","name":"RAKAN Sarawak","description":"An eyewitness to Sarawak\u2019s transformation","publisher":{"@id":"https:\/\/www.rakansarawak.com\/v3\/#organization"},"alternateName":"Rangkaian Khidmat Awam Negeri Sarawak","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.rakansarawak.com\/v3\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.rakansarawak.com\/v3\/#organization","name":"RAKAN Sarawak","alternateName":"Rangkaian Khidmat Awam Negeri Sarawak","url":"https:\/\/www.rakansarawak.com\/v3\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rakansarawak.com\/v3\/#\/schema\/logo\/image\/","url":"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2023\/12\/logo-rstagline.png","contentUrl":"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2023\/12\/logo-rstagline.png","width":172,"height":120,"caption":"RAKAN Sarawak"},"image":{"@id":"https:\/\/www.rakansarawak.com\/v3\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/rakanswk","https:\/\/x.com\/RAKANSarawak"]},{"@type":"Person","@id":"https:\/\/www.rakansarawak.com\/v3\/#\/schema\/person\/f9568270f31f7a204818ac5f97acd774","name":"rakan09sarawak","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rakansarawak.com\/v3\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/88c31a4db549f3e8804532b83b490f5ed8f3546ab7a88a35247213bca352891e?s=96&r=g&d=https:\/\/www.rakansarawak.com\/v3\/wp-content\/plugins\/userswp\/assets\/images\/no_profile.png","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/88c31a4db549f3e8804532b83b490f5ed8f3546ab7a88a35247213bca352891e?s=96&r=g&d=https:\/\/www.rakansarawak.com\/v3\/wp-content\/plugins\/userswp\/assets\/images\/no_profile.png","caption":"rakan09sarawak"},"url":"https:\/\/www.rakansarawak.com\/v3\/myprofile\/rakan09sarawak\/"},false]}},"yasr_visitor_votes":{"stars_attributes":{"read_only":true,"span_bottom":"<div class='yasr-small-block-bold'><span class='yasr-visitor-votes-must-sign-in'>You must sign in to vote<\/span><\/div>"},"number_of_votes":0,"sum_votes":0},"publishpress_future_action":{"enabled":false,"date":"2026-04-15 20:15:07","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.rakansarawak.com\/v3\/wp-json\/wp\/v2\/posts\/14490","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rakansarawak.com\/v3\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rakansarawak.com\/v3\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rakansarawak.com\/v3\/wp-json\/wp\/v2\/users\/960"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rakansarawak.com\/v3\/wp-json\/wp\/v2\/comments?post=14490"}],"version-history":[{"count":0,"href":"https:\/\/www.rakansarawak.com\/v3\/wp-json\/wp\/v2\/posts\/14490\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rakansarawak.com\/v3\/wp-json\/wp\/v2\/media\/14487"}],"wp:attachment":[{"href":"https:\/\/www.rakansarawak.com\/v3\/wp-json\/wp\/v2\/media?parent=14490"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rakansarawak.com\/v3\/wp-json\/wp\/v2\/categories?post=14490"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rakansarawak.com\/v3\/wp-json\/wp\/v2\/tags?post=14490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}